• The facility will be accessed from the bridge deck level at the city pause point. The cafe at the city-side landing of the Kangaroo Point Green Bridge.
  • Construction of the Kangaroo Point Green Bridge started in late 2021 and is anticipated to be completed in 2024. With a standard lift capacity of 330t at a 15m...
  • A consortium led by BESIX Watpacy has been awarded a contract by Brisbane City Council for the construction of the Kangaroo Point Green Bridge (KPGB)...
  • The Kangaroo Point Green Bridge will provide several opportunities for new event spaces, dining and drinking on the bridge and help to create new riverside...
  • Marr Contracting’s M2480D tower crane has installed the final piece of the 95 m-tall mast centrepiece of the Kangaroo Point Green Bridge in Brisbane, Australia.
  • Marr Contracting has been awarded the subcontract to deliver specialised heavy lifting crane services on the Kangaroo Point Green Bridge in Brisbane.
  • Brisbane City Council has revealed new designs of the future Kangaroo Point Green Bridge, responsible for connecting the suburb to the city.
  • While connecting you to working architects to give you insights and feedback into your work.” Kangaroo Point Green Bridge Student Design Gallery.
  • Kangaroo Point Green Bridge's Details. Address. About. Kangaroo Point Green Bridge's Listings. Discover.