• Hızlı yanıt
  • Davis Dam is a zoned earth-fill dam with a concrete spillway, 1,600 ft (490 m) in length at the crest, and 200 ft (61 m) high. The earth fill dam begins on the Nevada side, but it does not extend to the Arizona side on the east. Instead, there is an inlet formed by earth and concrete, that includes the spillway.
    Kaynaktan alınan bilgiyle göre oluşturuldu
    Hata bildir
  • Arama sonuçları
  • The Davis Dam Power Plant is a hydroelectric power plant located on the Arizona side of the dam, beside the inlet.[1] The hydroelectric plant generates between 1...
  • We made a picnic lunch and headed for the Nevada side of the Davis Dam..
  • On the Arizona side of the river and managed by the Mohave County Parks Department (1-877-757-0915) is Davis Dam Camp...
  • Commonly known as Hoover Dam and Davis Dam, these iconic structures paved the way for supplying water and electrical power to our surrounding regions.
  • The Mexican Treaty of 1944 required the United States to construct Davis Dam for regulation of water to be delivered to Mexico.
  • On February 20, 1943, Reclamation formally terminated the contract with the Utah Construction Company for construction of the Davis Dam and Powerhouse.
  • Davis Dam installed an LRAD long range communication and security system equipped with an integrated camera, high-intensity searchlight and robust, IP...
  • The Davis Dam still works to control water release from the Hoover Dam, and it continues to provide residents in Arizona and Nevada with a hearty fresh drinking...
  • Davis Dam is an earthfill dam that was completed in 1951.